for pharding
Guest





PostPosted: Sat Feb 11, 2006 11:08 pm    Post subject: mister pharding Reply with quote

mister pharding



how is work on costruction doing



do you tire of it ever, looks like hard



do you have internet place for photos



you good owner







sorry for my english
Back to top
pharding



Joined: 25 Jun 2005
Posts: 2213
Location: River Forest, Illinois

PostPosted: Sun Feb 12, 2006 12:14 am    Post subject: Reply with quote

We have photos at the following post below: Davenport House Construction Photos - 2.



Currently we are waiting for the heating contractor to install the heating ventillating and air conditioning system. We are also waiting for the arrival of second floor ceiling grilles. The ceiling grilles create a frameless plaster slot that is approximately 1 inch wide x approximately 60 inches long. The supply grilles are approximately 5 inches off of the outside wall and centered on window openings. When you walk into the second floor bedrooms the supply grilles will be barely visible. They will read as a fine line on the ceiling. The return grilles are 2 inches wide and will be located above the door on the ceiling as you enter the room. Within the supply slot is a cable that can drop down to control a really clever damper in the boot of the grille. All of the second floor ductwork has a 1 inch lining and is designed for very low velocity so the that HVAC system will be very quiet for the second floor bedrooms. The second floor HVAC unit is in the attic.



The ground floor is served by a basement HVAC unit. We are using the original 1901 floor grilles. We are adding several more 1901 floor grilles to give a more balanced air flow for the first floor.



As soon as this is completed we will have a security system installed. The balance of the electrical work will be completed. We will have conduit installed for the audio video system and a computer network. Then we will install mold resistant insulation. This insuation has a kraft paper face to allow the wall to breath without trapping moisture. We are not using a PVC vapor barrier. The house will be highly insulated to reduce the gas and electric bills. When those tasks are completed the rocklath will be installed, followed by the plaster work.



When the weather breaks in the spring the carpenters will swing back into the exterior to complete that work.



We are evaluating the costs to see if we can afford to do a stained cedar shingle roof like the house had originally.



Simultaneously with the above construction activities, we are doing samples of wall finishes and paint sytems to match the original finishes.



Am I tired of the project? No, I enjoy it immensely. Unfortunately I still need to also focus on running a 10 person architectural firm while this is going on. The mounting construction costs are a serious concern.
_________________
Paul Harding FAIA Owner and Restoration Architect for FLW's 1901 E. Arthur Davenport House, the First Prairie School House in Chicago | www.harding.com | LinkedIn
Back to top
View user's profile Send private message Visit poster's website
Display posts from previous:   
Post new topic   Reply to topic    Wright Chat Forum Index -> Click Here for General Discussion Posts All times are GMT - 5 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB © 2001, 2005 phpBB Group
Protected by Anti-Spam ACP