Wright Chat

 
FAQ FAQ Register Register
Search Search Profile Profile
Memberlist Memberlist Log in to check your private messages Log in to check your private messages
Usergroups Usergroups Log in Log in

>> Return to SaveWright Home Page

usonian boiler
Goto page Previous  1, 2, 3
 
Post new topic   Reply to topic    Wright Chat Forum Index -> Click Here for General Discussion Posts
View previous topic :: View next topic  
Author Message
DRN



Joined: 10 Jul 2006
Posts: 3839
Location: Cherry Hill, NJ

PostPosted: Tue Aug 26, 2008 3:51 pm    Post subject: Reply with quote

peterm: A Buderus rep was just in our office, and we looked up prices for the boiler and oil burner at my house:

Buderus G215/4 boiler $2068.00
Beckett AFG oil burner $ 811.00

Please note: these are trade prices and not list prices, but they give an idea of dealer cost when speaking with sellers.
Back to top
View user's profile Send private message
flwright



Joined: 07 Jan 2005
Posts: 116
Location: Saint John, New Brunswick

PostPosted: Tue Aug 26, 2008 4:45 pm    Post subject: Reply with quote

SDR: To answer your question, yes, casting PEX in concrete is very common in addition to the "dry" system. Pex can be cast in a regular concrete slab or in lightweight concrete over wood framing for upper storeys of wood framed buildings. You just have to be very careful to not place the tubing where walls will be fastened (the nails!) and renovating after-the-fact can be tricky for the same reason.
_________________
Morgan
Back to top
View user's profile Send private message
outside in



Joined: 29 Jul 2006
Posts: 1221

PostPosted: Wed Aug 27, 2008 8:44 am    Post subject: Reply with quote

Don't get me wrong, radiant heat is wonderful - it works well with Passive Solar too, as the floor can be heated by the sun and then supplement heat provided by the radiant coils.

I would only advise that the tubing be installed in such a manner that it is accessible, i.e., beneath the sheathing (staple up) OR within the sleeve of wrought iron, using the W.I. piping like conduit, so that the pex can be removed and replaced in the future. The latter is very expensive, but should be considered for retrofitting an existing (leaky) system.
Back to top
View user's profile Send private message
SDR



Joined: 17 Jun 2006
Posts: 18299
Location: San Francisco

PostPosted: Wed Aug 27, 2008 9:40 am    Post subject: Reply with quote

I suppose that it would be theoretically possible, on a good day, to fish the PEX into an existing W.I. or copper embedded heat coil system -- unless there were right-angle fittings ? Maybe those would be near the boiler only, and could be excavated, without ripping up the whole slab. . .

SDR
Back to top
View user's profile Send private message Send e-mail
outside in



Joined: 29 Jul 2006
Posts: 1221

PostPosted: Wed Aug 27, 2008 10:21 am    Post subject: Reply with quote

The "fishing" technique has been used in refrigeration coils - and would probably NOT work in a cast-iron system - it would be ideal for a 2 inch diameter wrought-iron system with curved piping, however. A "mouse" is first sent through the piping with pull chords attached. The piping is lubricated and then pulled through the pipe. A fairly simple fix, and far less costly than pulling up the entire concrete slab.
Back to top
View user's profile Send private message
RJH



Joined: 29 Mar 2006
Posts: 682
Location: Fort Wayne, Indiana

PostPosted: Wed Aug 27, 2008 2:10 pm    Post subject: Reply with quote

...

Last edited by RJH on Sun Sep 14, 2008 1:02 pm; edited 1 time in total
Back to top
View user's profile Send private message Send e-mail Visit poster's website
outside in



Joined: 29 Jul 2006
Posts: 1221

PostPosted: Wed Aug 27, 2008 2:30 pm    Post subject: Reply with quote

In looking at construction photographs, it appears that the piping was set upon gravel and the concrete poured over the top, which is different from the method used today. We can only speculate, but it appears Wright thought that the steel/cast iron/ copper piping would double as the concrete reinforcing, which is best off placed near the bottom of the slab. Today most PEX piping is applied to the top of the steel mesh and imbedded in the slab. In either case, replacement involves removing the slab, installing new piping (as well some insulation to thermally isolate the slab) and repour the slab.
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    Wright Chat Forum Index -> Click Here for General Discussion Posts All times are GMT - 5 Hours
Goto page Previous  1, 2, 3
Page 3 of 3

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB © 2001, 2005 phpBB Group
Protected by Anti-Spam ACP